Installations/Commissioning
Installation and commissioning of a coating line
Project from August 2021 till July 2022
The machine got 6 different coating heads for:
- Silicone coating
- Comma-bar coating
- Hotmelt coating
- Water based adhesive coating
- Top coat
- Primer coating
Additional features are:
- Grooving station
- Edge cutting device
- Quality camera system
- Coat weight control
- Moisture control